SmartTec Power Engineers provide expert services with depth, passion and excellency in the electricity infrastructure cluster through planning, design and construction stages at all voltage levels (0.4V - 400kV)
Power plant project advisory, planning, design and feasibility studies at all voltage levels
Network infrastructure project advisory, planning, design with construction up to 33kV
Grid connection planning and advisory at all voltage levels.
Mining
Farming
Commercial
Industrial
Residential Clients
Electrical and Solar design, installations and repairs
Key Deliverables:
Project Packaging for Capital Raising and Capital Raising Support
Feasibility Study
Project Power Plant Design
330/33kV Air Insulated Substation Design
330kV Overhead Line Design
Project Business Plan
Preparation of Bill of Quantity
Financial Analysis
Risk Analysis and register
330kV Overhead Line Route Mapping
Project Tariff Derivation and analysis
Key Deliverables:
Project Capital Raising
Project Packaging for Capital Raising and Capital Raising Support
Feasibility Study
Project Power Plant Design
330/88/33kV Air Insulated Substation Design
330kV Overhead Line Design
88kV Overhead Line Design
Equipment Specification
Project Business Plan
Preparation of Bill of Quantity
Financial Analysis
Risk Analysis and register
330kV and 88kV Overhead Line Route Mapping
Project Tariff Derivation and analysis
Regulatory approvals Advisory
Grid Impact Assessment applications
ESIA Studies and Certification
Wayleave Acquisition
Transmission Connection Agreements
Power Wheeling Agreements
Generation Licensing Application
ZIDA Licensing
Power Purchase Agreements
Drafting
Tariff calculation and strategy
Negotiations
Key Deliverables:
Project Capital Raising
Project Packaging for Capital Raising and Capital Raising Support
Feasibility Study
Project Power Plant Design
132/33kV Air Insulated Substation Design
Equipment Specification
Project Business Plan
Preparation of Bill of Quantity
Financial Analysis
Risk Analysis and register
132kV Overhead Line Route Mapping
Project Tariff Derivation and analysis
Regulatory approvals Advisory
Grid Impact Assessment applications
ESIA Studies and Certification
Wayleave Acquisition
Transmission Connection Agreements
Power Wheeling Agreements
Generation Licensing Application
Work Description
A. Derive OCEF protection settings.
B. Carryout power system studies for Minimum and Maximum Short Circuit Currents.
C. Carryout OCEF protection grading and coordination studies for the circuits listed below
D. Submit a protections settings and coordination report
30MVA 88/33/11KV Transformer
88KV Incomer Bay
88kV Local Feeders (local and remote)
Capacitor Bank
11KV Incomer and 33kV incomer
Grounding transformer
The grid integration study objectives are to:
Explore the possible maximum power plant capacity
Establish the least cost, compliant, strategic and secure power plant connection and evacuation
Explore all credible power system risks to the operation of the power plant
Identify optimised grid reinforcement intervention requirements that are critical for the secure and reliable operation of the power plant
Grid Integration Study Key Deliverables
Design Generator connection layout
Substation Layout Power Producer
Substation Layout Power BSP
Generator Connection Circuit Layout
Optimisation of Power Station Security:
Substation Security
Grid Connection Security Optimisation
Special Generator to Grid Protection evaluation
Reactive Compensation Equipment Selection & Sizing
Comprehensive Power System Study Covering:
Load flow studies
Power System Transient Stability Studies
System Power System Dynamic Stability Studies
Power System Fault Level Studies
The Scope of work key components:
Review the grid application status and available quotations and designs
Conduct a connection design appraisal to identify the best least cost and optimum connection to the grid Including:
The least cost connect path to the grid
Line route mapping
Substation design
Project costing and construction strategy
Resuscitation of connection progress
Apply for grid connection and secure connection approvals
Infrastructure construction and commissioning
Negotiate connection conditions and associated grid related agreements.